Chilled Water Leak/Power Outage at Roger Adams Lab

2/7/2021 2:30:00 PM
A Chilled Water Leak/Power Outage has occurred at Roger Adams Lab. This leak has flooded the basement and taken power out to the South Addition of the building. All appropriate crafts/trades have been dispatched for repair and cleanup. Leak was stopped @ 5:30pm on 2/7/21 and power was restored @ 12pm on 2/9/21.